Grid-scale BESS project development across Europe and Australia, with asset orchestration and industrial control protection alongside.

Capital Sources
Development Capital
Pursuit funding that carries a project through the gates, ahead of construction finance. This is the stage most capital will not touch.
Debt & Project Finance
Senior and mezzanine facilities structured around contracted revenue streams and SPV ring-fencing at financial close.
Strategic Co-investors
OEM, utility and grid-operator capital contributed alongside a commercial agreement rather than on financial terms alone.
Develop
Site origination to shovel-ready
Site identification, grid connection studies, environmental permitting, TSO/DSO interconnection agreements, and technical feasibility. Meridian takes projects from greenfield origination to a bankable package ready for financial close.
Grid Studies Permitting TSO/DSO Liaison Bankable Feasibility
Revenue Development fees + promoted interest at financial close
Structure
SPV · Finance · Contract stack
SPV design, equity and debt structuring, EPC and O&M contract negotiation, revenue contract stack (capacity market, ancillary services, PPA). Meridian bridges technical project risk and institutional capital requirements.
SPV Design Project Finance EPC/O&M Contracts Revenue Contracts
Revenue Arrangement fees + equity co-invest + success fees at financial close
Manage
Asset management after COD
Once an asset reaches commercial operation, Meridian can carry the asset-management mandate: dispatch optimisation across ancillary service markets through the orchestration platform, revenue stack management, regulatory compliance, and structured investor reporting across the asset lifecycle.
Dispatch Optimisation Revenue Management Regulatory Compliance Investor Reporting
Revenue Management fee + performance carry, where the mandate is taken
How We Develop
Gate 1 · Origination
Screen and secure
Node and hosting-capacity screening, landholder engagement, land control, and an early view on curtailment and revenue exposure.
Gate 2 · Connection
Studies and application
Grid connection application, system studies, and TSO or DSO negotiation. The longest and least forgiving stage in most markets.
Gate 3 · Permitting
Consent and approvals
Planning consent, environmental approvals, and the technical compliance package the connection agreement depends on.
Gate 4 · Ready to build
Bankable package
EPC and equipment selection, contract stack, and a de-risked package that can be taken to financial close or sold on.
Grid Revenue Streams
Frequency containment reserve (FCR-D)
FCAS – 6-second to 60-second
Wholesale energy arbitrage
Capacity market payments
Voltage / reactive power support
Geographic Footprint
🇫🇮🇸🇪
Nordics
Finland and Sweden
Nordic synchronous area
FCR-N · FCR-D · aFRR
🇪🇪
Baltics
Estonia
Continental Europe area
Post-desynchronisation reserves
🇵🇱
Poland
Capacity market and reserves
Coal transition build-out
Origination stage
🇦🇺
Australia
National Electricity Market
FCAS and wholesale arbitrage
Distribution-connected sites